Environmental Impact Statement Goethals Bridge Replacement Logo
 
Overview - Goals
 

Given the purpose and need for the proposed replacement of the Goethals Bridge, the goals are to:

  • Address the functional obsolescence of the existing Goethals Bridge.

  • Address structural integrity issues associated with the aging Bridge.

  • Reduce roadway congestion and delays and enhance mobility on the Goethals Bridge.

  • Improve the flow of goods to and from Staten Island and in the NY/NJ Region.

  • Correct the inability of the existing bridge to physically accommodate transit services.

  • Restore and enhance pedestrian access and provide for bicycle access.

  • Implement measures to improve bridge structural security.

  • Minimize environmental consequences of bridge replacement.

 
HOME USCG Logo
 
GBMP EIS Overview Link
  Steps in the Process
  NEPA Requirements
  Notice of Intent
  Scoping Process
  Purpose and Need
  Goals
  Preliminary Alternatives
  Potential Issues
  Refined Project Alternatives for DEIS Analysis
  Study Area
  Cultural Resources and Section 106 Consultation
  Draft EIS Published
  Formal Public Meetings
  Final EIS (FEIS) Published
  Preferred Alternative Selected - New Alignment South
  Modifications in the FEIS Since Publication of the DEIS
  General Conformity
  EIS Timeline
  Additional Resources
   
Get Involved Link
EIS Documents Link
Links Link
FAQs Link
Glossary of Terms Link
Contact Us Link
Participants Link
 
What's New Link
» Final EIS (FEIS) is published
» Preferred Alternative Selected – New Alignment South
» Public Review Period ends September 13, 2010:  How to submit comments
» Newsletter #8
» Draft General Conformity Determination Available for Review